 ===== Journal for the Edwards AUTO 306 Coating Systems ===== ===== Journal for the Edwards AUTO 306 Coating Systems =====
 +This is the journal.  See the [[equipment:edwards-306:start|Edwards AUTO 306 Coating System]] project page for an overview.
 +
 +==== Day 2026-05-16 (q3k, implr, hugo) ====
 +
 +Further work on the e-beam. Successfully evaporated Al (~140nm, multiple runs) on Cr (~1nm) on glass. Good adhesion.
 +
 +Al is very slow to evaporate for some reason.
 +
 +Successfully evaporated Al on Si.
 +
 +Successfully evaporated SiO2 on Al on Si.
 +
 +The cooling capacity from the chiller is a bit on the low side, especially when evaporating Al. It seems beneficial to go 'fast and hard' and let the system accumulate heat just for a short period of time rather than slowly depositing very little material but causing the temperature of the cooling water to increase past 35 degrees.
 +
 +==== Day 2026-05-15 (q3k, implr, leah, rahix) ====
 +
 +Rewired the thermal evaporator for 3 phase supply and installed infrastructure for it.  It runs from a 16A circuit now, and has a separate 4mm² potential bonding connection.
 +
 +A separate socket on the same 16A circuit will follow for the sputter coater. This means you shouldn't run them both at the same time.
 +
 +E beam supply has been tested and working. We had to manually enable the water flow sensor interlock input on the control cabinet (purple jumper wire).
 +
 +Getting the e-beam to run was annoying - turns out the system needs to be in 'process' mode.
 +
 +==== Day 2026-05-14 (implr, q3k, Hugo) ====
 +
 +First attempt at starting the sputter system. Hotwired just the Edwards supply skipping Wedel's interlock and pumped down. 3.4E-5 mbar ultimate pressure.
 +Examined the plasma high voltage box - in current configuration it looks like it's just a rectifier + series resistance.
 +
 +{{:equipment:edwards-306:e306_plasma_hv_box.jpg?600|}}
 +
 +Added a manual vent valve to one of the flanges on the back. Replaced the blocked up sintered KF ring on the vent path with a plain ring.
 +Plasma works, with some arcing around the electrodes - possibly breakdown of the built up film?
 +==== Day 2026-05-07 (q3k, Rob) ====
 +
 +Plasma experiments. Chamber is really filthy and nonconductive, that might be an issue in building a nice plasma across the whole chamber.
 +
 +Roughly cleaning the chamber with scotchbrite, blue towels, kimwipes soakes in isoprop as a proof of concept to see if surface becomes conductive and a better plasma can form.
 +
 +==== Day 2026-04-25 (q3k, rahix, zdmx, leah, rob, guest) ====
 +Played with some coating tests, see [[projects:semiconductors:log#day_2026-04-25_q3k_rahix_zdmx_leah_rob_guest|Lab Notes for FAFO Semiconductor Processes (2026-04-25)]].
 +==== Day 2026-04-19 (q3k, Hugo, Guest) ====
 +
 +Vent valve was not stuck - a sintered KF filter ring in front of it was. Removed filter ring, replaced with normal ring. Chamber now vents aggressively, added a flow restrictor outside that also acts as a very coarse filter.
 +
 +Film thickness monitor worked for a while, but now seemingly detects a broken crystal. Need to read more into the manual.
 +
 +Successfully coated Al on glass. Glass slide was held with Aluminium foil. Need better substrate holder for small/experimental pieces - to be designed.
 +
 +==== Day 2026-04-18 (q3k, Hugo, Rob, Jana, ln, Guest x3) ====
 +
 +**Evaporator:**
 +
 +Powered main cooling valve from external 230V. Checked main cooling loop for leaks. Seems ok. Marked valves for the two loops.
 +
 +Chiller unit couldn't deal with restricted flow form main cooling loop (in series: turbo pump, baffle, quartz microbalance). Put microbalance in parallel with turbo pump and baffle using press-fit T couplings.
 +
 +Rewired control box (in rack) to work off a single phase. Three phase is only needed for E-Beam power supply. Moved phase for 24V supply onto phase 1 too.
 +
 +Interlock form control box didn't seem to enable turbo controller (lines 13/14 on I/O connector). Bypassed for now, cable marked.
 +
 +Vent valve didn't seem to be actuated from the control box. Manually enabled for now.
 +
 +System went down to vacuum but not without a fight (timeouts, etc. - needs a good pumpdown for a few hours). Cleaned main seal. Managed to strike a plasma via HT. Managed to blow out thermal evap boat via LT.
 +
 +Turbo is very loud. Probably worth checking if we can recondition it.
 +
 +Shutter operates but slowly. Probably needs regreasing of its o-rings. We might have a replacement rotary feedthrough.
 +
 +Target rotation works as operated from the panel.
 +
 +Source change works as operated with the right knob.
 +
 +Needle valve operates. Butterfly valve in front of needle valve seems to leek - needle valve must be closed on each use.
  
 ==== Day 2026-03-30 ==== ==== Day 2026-03-30 ====
 Brought the two coating systems and the control cabinet into our lab. Brought the two coating systems and the control cabinet into our lab.
 +