meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
equipment:jeol-t330a [2024/10/03 19:19] – [Base Device] rahix | equipment:jeol-t330a [2025/05/10 22:53] (current) – q3k | ||
---|---|---|---|
Line 2: | Line 2: | ||
{{: | {{: | ||
- | Our scanning electron microscope. Quick specs: | + | Our first scanning electron microscope. Nicknamed ' |
**Maximum acceleration voltage:** 30kV | **Maximum acceleration voltage:** 30kV | ||
Line 66: | Line 66: | ||
| Flange towards Column | | Flange towards Column | ||
| Flange towards RP | 1 | 21 x 2.2 | Odd size? | | | Flange towards RP | 1 | 21 x 2.2 | Odd size? | | ||
- | + | | Flange towards solenoid valve | 1 | 26 x 3.5 | | |
- | === Connector types === | + | |
- | + | ||
- | Connector types observed in the machine: | + | |
- | + | ||
- | - 7556 series: {{ : | + | |
- | - DF1 series: {{ : | + | |
==== Attachments ==== | ==== Attachments ==== | ||
Line 84: | Line 78: | ||
- | ===== To do ===== | + | ==== Electronics |
- | ==== Blockers ==== | + | === ' |
- | - Machine/acquire sample holders | + | Seemingly allows for beam control. Asserting pin 3 disables display and enables external control. Pins 1 and 7 then allow for X/Y scanning |
- | - Track down column leak(s) | + | |
- | | + | |
- | - Check/ | + | |
- | ==== Medium-term ==== | + | ^ Pin on DE9 ^ Location in scope ^ Description |
+ | | 1 | PK00492 EK8 pin 4 | External vertical deflection | ||
+ | | 2 | | GND for pin 7 | | ||
+ | | 3 | PK00591 EF1 pins 2, 4 | Combined blank/ | ||
+ | | 4 | PK00492 EK3 pins 5, 7 | Video signal (post ACB) | | ||
+ | | 5 | | GND for pin 4 | | ||
+ | | 6 | | GND for pin 1 | | ||
+ | | 7 | PK00492 EK8 pin 2 | External horizontal deflection | ||
+ | | 8 | | GND for pin 3 | | ||
+ | | 9 | N/C | N/C | | ||
- | | + | |
- | - Machine mount for replacement Pirani gauge and reinstall cold cathode gauge | + | === Connector types === |
+ | |||
+ | Connector types observed in the machine: | ||
+ | |||
+ | | ||
+ | - DF1 series: {{ : | ||
+ | |||
+ | ==== Open Beam Interface (digital acquisition) ==== | ||
+ | |||
+ | Use [[https:// | ||
+ | |||
+ | Connect the OBI to power (currently through bundle of DIN SMPSes next to OBI), connect the OBI to the WHLE-LSE-1088A box via USB (or connect directly to your PC and run your own obi-server, after editing microscope.toml). Run GUI against microscope.toml. | ||
+ | |||
+ | TODO: move to dedicated mini PC (q3k ordered one). | ||
+ | |||
+ | ===== To do ===== | ||
==== Long-term ==== | ==== Long-term ==== | ||
Line 102: | Line 117: | ||
- Replace diffusion pump with turbomolecular pump | - Replace diffusion pump with turbomolecular pump | ||
- Get a better roughing pump (scroll) so it doesn' | - Get a better roughing pump (scroll) so it doesn' | ||
- | - Figure out what the ' | ||
- | - Digital control and acquisition | ||
- E-beam lithography | - E-beam lithography | ||
+ | ===== Log ===== | ||
- | ===== To buy ===== | + | === 2025/05/11 (q3k, rob, rahix) |
- | - 2x M4x7.5mm screws for clamping down transformer wires in control module | + | Attached |
- | - [[https:// | + | |
- | - (Torx?) socket cap head M4x12 screws for vacuum fittings | + | |
- | ===== Log ===== | + | === 2025/01/31 (q3k, rob, 0ff) === |
+ | |||
+ | New sample holder (EM-Tec JV50 + EM-Tec J4) has been attached. | ||
+ | |||
+ | === 2025/01/10 (q3k, rob, 0ff) === | ||
+ | |||
+ | New scintillator (PLANOTEC P47) has been mounted. | ||
+ | |||
+ | === 2024/11/09 (hugo, rahix, leah, ln) === | ||
+ | |||
+ | Replaced the succbone relay boards with a MODBUS-based system. | ||
+ | |||
+ | === 2024/10/15 (q3k, rob) === | ||
+ | |||
+ | Buzzed out ' | ||
+ | |||
+ | === 2024/10/14 (q3k, 0ff, hugo) === | ||
+ | |||
+ | Cleaned apertures in column a bit after building custom tool to extract the pole parts from the column. | ||
+ | |||
+ | Got some even better images. | ||
+ | |||
+ | === 2024/10/12 (q3k, hugo, 2x guest) === | ||
+ | |||
+ | Fixed alignment of the cathode. Spent some time dialing in optics. | ||
+ | |||
+ | Got some better images. | ||
+ | |||
+ | === 2024/10/10 (q3k, hugo, 0ff, rob) === | ||
+ | |||
+ | Attached samples to stage (QF105 die, stainless steel M3 screw). | ||
+ | |||
+ | Took first images, but they' | ||
+ | |||
+ | Weird electron gun behaviour. Filament doesn' | ||
+ | |||
+ | q3k says: | ||
+ | |||
+ | - Maybe I reassembled the wehnelt wrong? | ||
+ | - Maybe I damaged the cathode when cleaning the wehnelt? | ||
+ | - Maybe I reconnected the HV cable to the electron gun wrong? I pulled it out when I thought I had to empty the transformer tank. | ||
+ | |||
+ | To set the electron gun bias according per the manual' | ||
+ | |||
+ | === 2024/10/05 (q3k, rahix, rob) === | ||
+ | |||
+ | Tested diffusion pump with new oil. After outgassing, got down to the 6e-3 mbar that we also got with the other oil. Tested the ionization gauge which started showing lower values. | ||
+ | |||
+ | Turned on the electron beam for the first time. | ||
+ | |||
+ | === 2024/10/04 (q3k, rahix, hugo, guest) === | ||
+ | |||
+ | Replaced the diffusion pump oil with a proper one. Unfortunately didn't get to test it yet. | ||
+ | |||
+ | Replaced the DP heater wiring. | ||
+ | |||
+ | === 2024/10/03 (q3k, rahix, guests) === | ||
+ | |||
+ | Investigated the roughing pump in more detail. | ||
+ | |||
+ | Serviced the "RP vent valve" as this hasn't been done before. | ||
=== 2024/09/28 (q3k, rob, rahix) === | === 2024/09/28 (q3k, rob, rahix) === |