meta data for this page
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| equipment:edwards-306:start [2026/04/30 18:46] – q3k | equipment:edwards-306:start [2026/07/18 22:09] (current) – q3k | ||
|---|---|---|---|
| Line 10: | Line 10: | ||
| **Sputter: | **Sputter: | ||
| - | Needs Argon and refurbishing / bringup. | + | First sputter experiments were successful, process being tuned and MFC contro system is being built |
| **Coater:** | **Coater:** | ||
| - | Thermal evaporation works, e-beam needs bringup. Film thickness monitor needs a new crystal. | + | Working. |
| ===== Resources ===== | ===== Resources ===== | ||
| * [[equipment: | * [[equipment: | ||
| - | * [[https:// | + | |
| - | * [[https:// | + | |
| - | * [[https:// | + | * [[https:// |
| - | * Techtree: [[https:// | + | * [[https:// |
| + | * Techtree: | ||
| + | * [[https:// | ||
| + | * [[https:// | ||
| + | * [[https:// | ||
| - | {{: | ||
| ===== Standard Operating Procedure ===== | ===== Standard Operating Procedure ===== | ||
| + | {{: | ||
| Currently written for the thermal evap unit, should be unified with the sputter unit as it is brought up. | Currently written for the thermal evap unit, should be unified with the sputter unit as it is brought up. | ||
| Line 122: | Line 126: | ||
| - Turn off power at rack unit. | - Turn off power at rack unit. | ||
| + | ===== Sputter coater MFCs ===== | ||
| + | |||
| + | Channel 1: 100SCCM Ar. Channel 2: 100SCCM N2. | ||
| + | |||
| + | Pinout: | ||
| + | |||
| + | * Pin 2: Control 0-10V (0-100% of rated flow). | ||
| + | * Pin 4: Output 0-10V (feedback from control). | ||
| + | * Pin 5: shield | ||
| + | * Pin 6: +15V | ||
| + | * Pin 7: test output (unknown) | ||
| + | * Pin 8: common/GND | ||
| + | * Pin 9: -15V | ||
| + | Currently controlled by lab PSUs. Modbus integration is WIP. | ||