meta data for this page
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| equipment:jeol-t330a [2024/10/15 18:01] – q3k | equipment:jeol-t330a [2025/05/10 22:53] (current) – q3k | ||
|---|---|---|---|
| Line 2: | Line 2: | ||
| {{: | {{: | ||
| - | Our scanning electron microscope. Quick specs: | + | Our first scanning electron microscope. Nicknamed ' |
| **Maximum acceleration voltage:** 30kV | **Maximum acceleration voltage:** 30kV | ||
| Line 89: | Line 89: | ||
| | 3 | PK00591 EF1 pins 2, 4 | Combined blank/ | | 3 | PK00591 EF1 pins 2, 4 | Combined blank/ | ||
| | 4 | PK00492 EK3 pins 5, 7 | Video signal (post ACB) | | | 4 | PK00492 EK3 pins 5, 7 | Video signal (post ACB) | | ||
| - | | 5 | | GND for pin 6 | | + | | 5 | | GND for pin 4 | |
| | 6 | | GND for pin 1 | | | 6 | | GND for pin 1 | | ||
| | 7 | PK00492 EK8 pin 2 | External horizontal deflection | | 7 | PK00492 EK8 pin 2 | External horizontal deflection | ||
| Line 103: | Line 103: | ||
| - DF1 series: {{ : | - DF1 series: {{ : | ||
| + | ==== Open Beam Interface (digital acquisition) ==== | ||
| - | ===== To do ===== | + | Use [[https:// |
| - | ==== Blockers ==== | + | Connect the OBI to power (currently through bundle of DIN SMPSes next to OBI), connect the OBI to the WHLE-LSE-1088A box via USB (or connect directly to your PC and run your own obi-server, after editing microscope.toml). Run GUI against microscope.toml. |
| - | - Machine/ | + | TODO: move to dedicated mini PC (q3k ordered one). |
| - | - Track down column leak(s) | + | |
| - | - Check/ | + | |
| + | ===== To do ===== | ||
| ==== Long-term ==== | ==== Long-term ==== | ||
| Line 117: | Line 117: | ||
| - Replace diffusion pump with turbomolecular pump | - Replace diffusion pump with turbomolecular pump | ||
| - Get a better roughing pump (scroll) so it doesn' | - Get a better roughing pump (scroll) so it doesn' | ||
| - | - Figure out what the ' | ||
| - | - Digital control and acquisition | ||
| - E-beam lithography | - E-beam lithography | ||
| + | ===== Log ===== | ||
| - | ===== To buy ===== | + | === 2025/05/11 (q3k, rob, rahix) |
| - | - 2x M4x7.5mm screws for clamping down transformer wires in control module | + | Attached |
| - | - [[https:// | + | |
| - | - (Torx?) socket cap head M4x12 screws for vacuum fittings | + | |
| - | ===== Log ===== | + | === 2025/01/31 (q3k, rob, 0ff) === |
| + | |||
| + | New sample holder (EM-Tec JV50 + EM-Tec J4) has been attached. | ||
| + | |||
| + | === 2025/01/10 (q3k, rob, 0ff) === | ||
| + | |||
| + | New scintillator (PLANOTEC P47) has been mounted. | ||
| + | |||
| + | === 2024/11/09 (hugo, rahix, leah, ln) === | ||
| + | |||
| + | Replaced the succbone relay boards with a MODBUS-based system. | ||
| + | |||
| + | === 2024/10/15 (q3k, rob) === | ||
| + | |||
| + | Buzzed out ' | ||
| + | |||
| + | === 2024/10/14 (q3k, 0ff, hugo) === | ||
| + | |||
| + | Cleaned apertures in column a bit after building custom tool to extract the pole parts from the column. | ||
| + | |||
| + | Got some even better images. | ||
| + | |||
| + | === 2024/10/12 (q3k, hugo, 2x guest) === | ||
| + | |||
| + | Fixed alignment of the cathode. Spent some time dialing in optics. | ||
| + | |||
| + | Got some better images. | ||
| === 2024/10/10 (q3k, hugo, 0ff, rob) === | === 2024/10/10 (q3k, hugo, 0ff, rob) === | ||