meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
equipment:jeol-t330a [2024/10/16 09:47] – [Electronics] q3k | equipment:jeol-t330a [2025/05/10 22:53] (current) – q3k | ||
---|---|---|---|
Line 2: | Line 2: | ||
{{: | {{: | ||
- | Our scanning electron microscope. Quick specs: | + | Our first scanning electron microscope. Nicknamed ' |
**Maximum acceleration voltage:** 30kV | **Maximum acceleration voltage:** 30kV | ||
Line 89: | Line 89: | ||
| 3 | PK00591 EF1 pins 2, 4 | Combined blank/ | | 3 | PK00591 EF1 pins 2, 4 | Combined blank/ | ||
| 4 | PK00492 EK3 pins 5, 7 | Video signal (post ACB) | | | 4 | PK00492 EK3 pins 5, 7 | Video signal (post ACB) | | ||
- | | 5 | | GND for pin 6 | | + | | 5 | | GND for pin 4 | |
| 6 | | GND for pin 1 | | | 6 | | GND for pin 1 | | ||
| 7 | PK00492 EK8 pin 2 | External horizontal deflection | | 7 | PK00492 EK8 pin 2 | External horizontal deflection | ||
Line 95: | Line 95: | ||
| 9 | N/C | N/C | | | 9 | N/C | N/C | | ||
- | === Scan output connector === | ||
- | |||
- | JST XH connector on a three-colored (black, green, orange) wire harness. Cobbled together by q3k, will be used for image acquisition. | ||
- | |||
- | ^ Pin number ^ Wire color ^ Description ^ | ||
- | | 1 | Black | Ground | ||
- | | 2 | Green | H or V sync | | ||
- | | 3 | Orange | ||
- | |||
- | H/V sync needs to be figured out (by following the wires or with an oscilloscope). | ||
- | |||
- | H/V sync values are ramps +/- 5V (opamps are supplied +/- 8V). | ||
- | |||
- | The wires all go to U54 (opamp input) on PK00492 (the scanning board). This opamp is used to read back data from the EK9 connector. This connector allows for chaining scan/ | ||
=== Connector types === | === Connector types === | ||
Line 117: | Line 103: | ||
- DF1 series: {{ : | - DF1 series: {{ : | ||
+ | ==== Open Beam Interface (digital acquisition) ==== | ||
- | ===== To do ===== | + | Use [[https:// |
- | ==== Blockers ==== | + | Connect the OBI to power (currently through bundle of DIN SMPSes next to OBI), connect the OBI to the WHLE-LSE-1088A box via USB (or connect directly to your PC and run your own obi-server, after editing microscope.toml). Run GUI against microscope.toml. |
- | - Machine/ | + | TODO: move to dedicated mini PC (q3k ordered one). |
- | - Track down column leak(s) | + | |
- | - Check/ | + | |
+ | ===== To do ===== | ||
==== Long-term ==== | ==== Long-term ==== | ||
Line 131: | Line 117: | ||
- Replace diffusion pump with turbomolecular pump | - Replace diffusion pump with turbomolecular pump | ||
- Get a better roughing pump (scroll) so it doesn' | - Get a better roughing pump (scroll) so it doesn' | ||
- | - Figure out what the ' | ||
- | - Digital control and acquisition | ||
- E-beam lithography | - E-beam lithography | ||
+ | ===== Log ===== | ||
- | ===== To buy ===== | + | === 2025/05/11 (q3k, rob, rahix) |
- | - 2x M4x7.5mm screws for clamping down transformer wires in control module | + | Attached |
- | - [[https:// | + | |
- | - (Torx?) socket cap head M4x12 screws for vacuum fittings | + | |
- | ===== Log ===== | + | === 2025/01/31 (q3k, rob, 0ff) === |
+ | |||
+ | New sample holder (EM-Tec JV50 + EM-Tec J4) has been attached. | ||
+ | |||
+ | === 2025/01/10 (q3k, rob, 0ff) === | ||
+ | |||
+ | New scintillator (PLANOTEC P47) has been mounted. | ||
+ | |||
+ | === 2024/11/09 (hugo, rahix, leah, ln) === | ||
+ | |||
+ | Replaced the succbone relay boards with a MODBUS-based system. | ||
=== 2024/10/15 (q3k, rob) === | === 2024/10/15 (q3k, rob) === |