meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
equipment:zeiss-dsm-962 [2025/03/21 23:42] – q3k | equipment:zeiss-dsm-962 [2025/03/21 23:52] (current) – q3k | ||
---|---|---|---|
Line 14: | Line 14: | ||
**Attachments/ | **Attachments/ | ||
+ | |||
+ | |||
+ | ==== Powering on the scope ==== | ||
+ | |||
+ | - Turn on the water chiller and make sure the valves are configured to run a water loop through Kevin (and not Kenji) | ||
+ | - Plug in the main power connector to a power socket | ||
+ | - Turn the key on the console to ' | ||
+ | - If you were at atmosphere before evacuating, the evacuation will time out. Quickly press reset on the vacuum control panel before the system vents fully again. Evacuation will start up again. | ||
+ | - Once the column reaches HV-capable pressure (marked on the bar graph with a piece of tape), an LED will illuminate on the control panel and you can turn on the rest of the system. Rotate the key to the ' | ||
+ | - Wait for the DOS software to boot. | ||
+ | - Enable high voltage and filament. | ||
+ | - The system should now be operational. | ||
+ | |||
+ | ==== Venting the column === | ||
+ | |||
+ | To vent the column (eg. to change samples or inspect/ | ||
+ | |||
+ | - Press the VENT button on the vacuum control panel | ||
+ | - Wait a surprisingly long time (until hissing is done) | ||
+ | - Open chamber / gun, do your work, close it. | ||
+ | - Press the EVAC button on the vacuum control panel. | ||
+ | |||
+ | ==== Using the EDX system ==== | ||
+ | |||
+ | The detector is currently not mounted, but you can try using the system for image acquisition. | ||
+ | |||
+ | - Power on the Dell PC, wait for a boot to desktop | ||
+ | - Start the 'NSS ohne drift' script from the desktop | ||
+ | - Start the ' | ||
+ | - Select an existing or create a new project | ||
+ | - Ignore the warning about the detector being at high temperature (it's not, it's just disconnected) | ||
+ | - Select ' | ||
+ | - Press play to do a live acquisition, | ||
+ | |||
+ | If everything goes well, the DSM will go into ' | ||
+ | |||
+ | ==== Powering off the scope ==== | ||
+ | |||
+ | - Turn the key to the ' | ||
+ | - After the turbo spins down fully (listen to it by ear), disconnect the main power plug. | ||
+ | - Turn off the water chiller once temperature is below 24 degrees Celsius. | ||
+ | |||
+ | ==== Vacuum-System ==== | ||
+ | |||
+ | The vacuum system looks like follows: | ||
+ | |||
+ | {{: | ||
+ | |||
+ | The original roughing pump (RP) is an Edwards E2M8 rotary pump, we have a replacement. Our DSM is equipped with a Pfeiffer TPH 240 IS turbomolecular pump. | ||
==== Electronics ==== | ==== Electronics ==== | ||
Line 63: | Line 112: | ||
We replaced the BIOS battery. In case it dies again, you will have to set the BIOS to defaults, then press F1 and change the **Diskette drive-0** to 1.4 Mb **Fix-disk drive-0** type to **29**. Press F2 and let the device boot, some software will then reconfigure the rest of the BIOS accordingly. | We replaced the BIOS battery. In case it dies again, you will have to set the BIOS to defaults, then press F1 and change the **Diskette drive-0** to 1.4 Mb **Fix-disk drive-0** type to **29**. Press F2 and let the device boot, some software will then reconfigure the rest of the BIOS accordingly. | ||
- | ==== Powering on the scope ==== | ||
- | |||
- | - Turn on the water chiller and make sure the valves are configured to run a water loop through Kevin (and not Kenji) | ||
- | - Plug in the main power connector to a power socket | ||
- | - Turn the key on the console to ' | ||
- | - If you were at atmosphere before evacuating, the evacuation will time out. Quickly press reset on the vacuum control panel before the system vents fully again. Evacuation will start up again. | ||
- | - Once the column reaches HV-capable pressure (marked on the bar graph with a piece of tape), an LED will illuminate on the control panel and you can turn on the rest of the system. Rotate the key to the ' | ||
- | - Wait for the DOS software to boot. | ||
- | - Enable high voltage and filament. | ||
- | - The system should now be operational. | ||
- | |||
- | ==== Vacuum-System ==== | ||
- | |||
- | The vacuum system looks like follows: | ||
- | |||
- | {{: | ||
- | |||
- | The original roughing pump (RP) is an Edwards E2M8 rotary pump, we have a replacement. Our DSM is equipped with a Pfeiffer TPH 240 IS turbomolecular pump. |