====== Lab Notes for the Scanning Tunneling Microscope ====== | ====== Lab Notes for the Scanning Tunneling Microscope ====== | ||
- | ==== Day 2025-09-07 (rahix, q3k, hugo) ==== | + | ==== Day 2025-09-20 (rahix) ==== |
+ | Modelled more of the as-built of the current STM setup in mechanical CAD so we have a reference model: | ||
+ | |||
+ | {{: | ||
+ | ==== Day 2025-09-07 | ||
+ | Took the video capture from yesterday, of the beam bouncing from the STM off a mirror 2.35m away and back to the camera on the STM and ran some analysis on the data. | ||
+ | |||
+ | Analysis works like this: For each frame, we find the beam center. | ||
+ | |||
+ | Here is the final figure: | ||
+ | |||
+ | {{: | ||
+ | |||
+ | The most interesting result is the peak highlighted by the red line. The red line marks the theoretical resonance frequency of the vibration isolation system that we had calculated in the past. Seeing a peak right at this frequency sparks a lot of confidence! | ||
+ | |||
+ | The results are limited up the 15 Hz because of the 30 fps video capture. | ||
+ | ==== Day 2025-09-06 | ||
Rebuilt the entire experiment to clean up the space and install some shelving. | Rebuilt the entire experiment to clean up the space and install some shelving. | ||
Line 501: | Line 517: | ||
Played a bit more with the [[https:// | Played a bit more with the [[https:// | ||
- | {{: | + | {{: |
Line 518: | Line 534: | ||
Calculated the damping behavior of our setup: | Calculated the damping behavior of our setup: | ||
- | {{: | + | {{: |
EMI Box: | EMI Box: | ||
Line 595: | Line 611: | ||
Removed the formwork from the conrete block we poured on friday. | Removed the formwork from the conrete block we poured on friday. | ||
- | {{: | + | {{: |
* Lessons learned: | * Lessons learned: | ||
Line 613: | Line 629: | ||
Poured a concrete weight for the vibration isolation system: | Poured a concrete weight for the vibration isolation system: | ||
- | {{: | + | {{: |
* Lessons learned: | * Lessons learned: |